“My understanding is that the Orion for Artemis 1 has done very well during testing of ground processing and Wet Dress Rehearsal testing,” noted Schneider. Meanwhile, the older sibling Orion for Artemis 1 has so far passed its portion of the mission’s Wet Dress Rehearsal with flying colors. This delivery to NASA is currently targeted for Quarter 4 of 2023. After Solid Rocket Booster separation, the Orion’s European Service Module engines have enough power to push Orion safely away from a potentially failing SLS Core Stage or Interim Cryogenic Propulsion Stage. The Launch Abort System separates from the Orion capsule during a nominal ascent to orbit. We have direct field acoustics to do at the module level for both Crew Module and Service Module.”Īfter this, the next step will be vacuum testing on the integrated Orion assembly (which includes the Service Module) before delivering the system to NASA for stacking and flight on the Space Launch System (SLS) rocket. We still have some environmental testing to do, we have thermal cycle at the module levels for both the Crew Module and Service Module. He continued: “The phase we’re getting into now for Artemis 2 is we’re getting into a more test-centric phase versus an assembly or build phase. So if you were to walk out on the shop floor, you would see a nearly fully assembled Service Module that still has some work to go and some testing at the module level.” “ The European Service Module has been integrated to the Crew Module Adapter, which is the part of the Service Module that builds and tests,” noted Schneider. Meanwhile, this Orion’s European Service Module (ESM) is also at the Kennedy Space Center and undergoing preparations for integrated testing and flight. “We finally got enough of the avionics and the electronics and all the wiring and everything else that’s needed onboard and integrated such that we could power it up for the first time and kind of bring it to life, load flight software, etc.,” related Schneider.Ĭertain functional checkouts of the capsule’s nascent state are currently being conducted, with Schneider noting that a good deal of assembly and integration work remains for this capsule even though it is far along in its overall build lifecycle. The Artemis II Orion inside the Neil Armstrong Operations and Checkout Building. The Orion capsule for Artemis 2 is currently in the Operations and Checkout (O&C) building at the Kennedy Space Center, where the Orions are assembled and - to a degree - tested. Schneider himself has been with the Orion program from its inception and was part of the team that drafted the spacecraft’s initial proposal when it was part of the now-canceled Constellation Program. “We just powered it up for the first time, which is a huge milestone for us because we’ve been working on it now for several years,” said Jules Schneider, Director of Orion Assembly, Test, and Launch Operations at Lockheed Martin - a position responsible for overseeing the assembly and testing of the spacecraft up to the point where it is delivered to NASA. Lockheed Martin has completed the first-time power-up of the Orion capsule for the Artemis 2 mission - the first Orion capsule that will be tasked with carrying humans.Īs work continues on that capsule, Lockheed Martin - the prime contractor for the Orion spacecraft - provided updates on the other three capsules, and three European Service Modules, currently in various stages of their respective flows for Artemis missions 1, 2, and 3.Ī significant milestone for all spacecraft is their very first power-up - a milestone the Orion capsule for Artemis 2 achieved the week of May 23.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |